Project: 2105 Sichuan Erdaoqiao Hydropower Project - Crediting Period Renewal Request
[]
Project 2105: Sichuan Erdaoqiao Hydropower Project

- project design document (777 KB)

PDD appendices
Appendix 1 - Untitled (uploaded 17 Jan 23 07:03:55) (28 KB)

- crediting period renewal form (147 KB)
Methodologies Used ACM0002 ver. 21 - Grid-connected electricity generation from renewable sources
VVS Version VVS-PA 3.0
Standardized baselines used N/A
Amount of Reductions 122,186 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (643 KB)
Renewal Date 21 Apr 23 (Renewable) Provisional (awaiting guidance from the CMP at CMP 16)   (view history)   completeness check info & rep check: concluded
Crediting Period (requested for renewal) 26 Jan 23 - 25 Jan 30

Other crediting period(s): 26 Jan 09 - 25 Jan 16 26 Jan 16 - 25 Jan 23
Requests for Issuance
and related documentation