Project: 0584 Korea Water Resources Corporation (KOWACO) small-scale hydroelectric power plants project - Crediting Period Renewal Request
[]
Project 0584: Korea Water Resources Corporation (KOWACO) small-scale hydroelectric power plants project

- project design document (792 KB)

PDD appendices
Appendix 1 - EF Calculation (192 KB)
Appendix 2 - Historical Data (102 KB)

- crediting period renewal form (62 KB)
Methodologies Used AMS-I.D. ver. 17 - Grid connected renewable electricity generation
VVS Version
Standardized baselines used N/A
Amount of Reductions 8,103 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (706 KB)
Renewal Date 06 Dec 13 (Renewable - Expired)   (view history)  
Renewal no longer possible
Crediting Period (requested for renewal) 01 Jan 14 - 31 Dec 20

Other crediting period(s): 01 Jan 07 - 31 Dec 13
Requests for Issuance
and related documentation