Project: 0584 Korea Water Resources Corporation (KOWACO) small-scale hydroelectric power plants project - Crediting Period Renewal Request
Project 0584: Korea Water Resources Corporation (KOWACO) small-scale hydroelectric power plants project

- project design document (792 KB)

PDD appendices
Appendix 1 - EF Calculation (192 KB)
Appendix 2 - Historical Data (102 KB)

- crediting period renewal form (62 KB)
Methodologies Used AMS-I.D. ver. 17 - Grid connected renewable electricity generation
VVS Version
Standardized baselines used N/A
Amount of Reductions 8,103 metric tonnes CO2 equivalent per annum
Validation Opinion Validation opinion (706 KB)
Renewal Date 06 Dec 13   (view history)  
Crediting Period (requested for renewal) 01 Jan 14 - 31 Dec 20

Other crediting period(s): 01 Jan 07 - 31 Dec 13
Requests for Issuance
and related documentation