Submission incomplete:
1: The PP/DOE are requested to describe the GHG sources with in the project boundary in the PDD as per EB 48 Annex 60 paragraph 10 (a).
The PDD (page 10) includes a diagram of the project boundary that is not complete.
2: The PP/DOE are requested to include the details of each monitoring parameter listed as per EB 48 Annex 60 paragraph 10 (a).
The applicable methodology (page 12) requires that “The total fuel consumption will be monitored both at supplier and project end for cross-verification”, however, this requirement was not included in the monitoring plan.
3: The DOE is requested to resolve all CARs and CLs raised as per VVM v 1.2 paragraph 37.
CAR B-4 (VR page 26) was left as OPEN.
1: The PP/DOE are requested to describe the GHG sources with in the project boundary in the PDD as per EB 48 Annex 60 paragraph 10 (a).
The PDD (page 10) includes a diagram of the project boundary that is not complete.
2: The PP/DOE are requested to include the details of each monitoring parameter listed as per EB 48 Annex 60 paragraph 10 (a).
The applicable methodology (page 12) requires that “The total fuel consumption will be monitored both at supplier and project end for cross-verification”, however, this requirement was not included in the monitoring plan.
3: The DOE is requested to resolve all CARs and CLs raised as per VVM v 1.2 paragraph 37.
CAR B-4 (VR page 26) was left as OPEN.