Reports of the CDM AR WG and CDM SSC WG available / SSC Methodologies / Other methodological issues

Reports of the CDM AR WG and CDM SSC WG available / SSC Methodologies / Other methodological issues

------------------------------------------------------------
Reports of the CDM AR WG and CDM SSC WG available
------------------------------------------------------------

Please be informed that the below listed documents are available on the UNFCCC CDM website:

(a) The report of the twenty-third meeting of the CDM Afforestation and Reforestation Working Group (AR WG) is available in the AR WG section of the UNFCCC CDM website: <https://cdm.unfccc.int/Panels/ar>.

(b) The report of the nineteenth meeting of the Small Scale Working Group (SSC WG) is available in the SSC WG section of the UNFCCC CDM website:
<https://cdm.unfccc.int/Panels/ssc_wg>.


------------------------------------------------------------
SSC Methodologies
------------------------------------------------------------

The following proposals on new SSC methodologies have been submitted to the CDM Executive Board for its review and are available for public input from 11 - 24 March 2009:

- SSC-NM025: Emission reduction measures in ferroalloy production
- SSC-NM026: Avoidance of Methane emissions through Manure Composting
- SSC-NM027: Optimizing Public Passenger Transport

The above submitted documentation is available under the following link:
http://cdm.unfccc.int/methodologies/SSCmethodologies/NewSSCMethodologies/index.html


------------------------------------------------------------
Other methodological issues
------------------------------------------------------------

(a) The following proposed new methodologies were sent from the Meth Panel through the DOE to the project participants to invite clarifications to the preliminary recommendations and technical clarifications to the following proposed new methodologies were provided:

- NM0282: Usipar Pulverized Charcoal Injection Project
- NM0286: LNG Terminal for natural gas supply and electric generation in the SING (Great North Interconnected System) trough a 780 MW combined cycle station in Gas Atacama
- NM0288: Installation of Combined Cooling Heating and Power (CCHP) systems in commercial buildings of DLF Building - 10, Gurgaon, India
- NM0292: Highly efficient power plant fuelled with blast furnace gas at TKCSA, in Rio de Janeiro, Brazil
- NM0295: Installation of an energy-saving ironmaking plant in the northern part of Vietnam

The above submitted documentation is available under the following link: http://cdm.unfccc.int/goto/MPpropmeth

(b) A new request for clarification of an approved AR methodology has been received. Further information on this submission is available on the UNFCCC CDM web site at: http://cdm.unfccc.int/methodologies/ARmethodologies/Clarifications/index.html

A response to this request for clarification was already provided by the AR WG in its twenty-third meeting (see report).