Call for public input on the draft revised methodology AM0023 “Leak detection and repair in natural gas production, processing, transmission, storage and distribution systems and in refinery facilities"


AM0023 “Leak detection and repair in natural gas production, processing, transmission, storage and distribution systems and in refinery facilities".

The draft revised AM0023 expands the applicability of the methodology to refinery gas and other natural gas operations and introduces a further alternative to calculate baseline emissions based on default values in addition to editorial improvements.

The call for inputs from public stakeholders will open from 7 July 00.00 GMT to 17 July 24.00 GMT.

The inputs to this call will be considered at the fifty-first meeting of the Methodologies panel held 15 - 19 August 2011.

Submission Date Submission
15 July 2011 at 05:47 GMT+2 Nick Allen (28 KB)
17 July 2011 at 01:12 GMT+2 Kevin James (75 KB)