Call for input on the draft revision of the methodology AMS-III.Q "Waste Energy Recovery (gas/heat/pressure) project" (from 14 May to 11 June 2012)

The Board agreed to launch a call for public input on the draft revision of the methodology.

Stakeholders are invited to provide their input on the Draft revision of AMS-III.Q "Waste Energy Recovery (gas/heat/pressure) project".
Questions to specific issues of the revised version of the methodology are contained in annex 8 to the report of the thirty-sixth meeting of the SSC WG.

The call for input from public stakeholders was open from 14 May (12:00 GMT) to 11 June 2012 (12:00 GMT).
The input from this call will be considered at the thirty-eighth meeting of the SSC WG.

Submission Date Submission
06 June 2012 at 12:15 GMT+2 Lalit K. Singhania (146 KB)
06 June 2012 at 12:15 GMT+2 Vikas Thakur (116 KB)
06 June 2012 at 13:06 GMT+2 rajendra kumar vishnoi (112 KB)