Call for input on the draft revision of the guideline "Sampling and surveys for CDM project activities and programmes of activities" (11 July to 8 August 2015, 24:00 GMT)

The SSC WG sought inputs on the top-down revision of the approved: 

  • Guideline “Sampling and surveys for CDM project activities and programmes of activities”.

The proposed revision aims to provide guidance on survey and data collection method for project proponents (PPs) and Designated Operational Entities (DOEs).

The draft revision was carried out in response to the approved workplan of panels and working groups for 2015 (EB 82 report, annex 2) and the workplan of the project “Simplification of methodologies including digitization to reduce transaction costs” (EB 82 report, annex 8). 

Stakeholders were invited to provide their inputs on the draft revision of the standard and guideline, as contained in annex 13  of the report of the 48th meeting of the SSC WG. Stakeholders were invited to provide their inputs in the commenting table found here.

The scope of the public input shall include but is not limited to text highlighted in the draft revised documents, as contained in annex 13 of the report of the 48th meeting of the SSC WG.

The call for inputs from stakeholders was open from 11 July to 8 August 2015 (24:00 GMT).

No input was received.