Call for inputs on draft revised Project Standard (PS), Validation and Verification Standard (VVS) and Project Cycle Procedure (PCP) (2 to 22 April 2014, 24:00 GMT)

The CDM Executive Board, at its seventy-fifth meeting, considered a concept note on the revision of the "Clean development mechanism project standard" (PS), the "Clean development mechanism validation and verification standard" (VVS) and the "Clean development mechanism project cycle procedure" (PCP) in relation to the next general revision of these three documents based on the inputs received from stakeholders and the experience gained by the secretariat. The Board requested the secretariat to prepare drafts of the revised PS, VVS and PCP and to launch a public call for input on the working versions of these documents.

Based on this, the secretariat sought inputs from stakeholders on the following versions of the draft revised PS, VVS and PCP:

1.Draft standard: CDM project standard
2. Draft standard: CDM validation and verification standard
3. Draft procedure: CDM project cycle procedure

These versions are based on the current versions with highlights of proposed changes. Editorial changes are not highlighted. The document Table of issues (149 KB) summarizes the main issues addressed and the location of corresponding sections/paragraphs modified in these versions of the documents.

The call was open from 2 to 22 April 2014, 24:00 GMT. Stakeholders were invited to provide their inputs by using the comment sheets below.

PS comment sheet  (41 KB)
VVS comment sheet (41 KB)
PCP comment sheet  (41 KB)

Submission Date Submission
15 April 2014 at 15:33 GMT+2 Carbon Market Watch (555 KB)
19 April 2014 at 06:10 GMT+2 Ethan Bio Fuels PLC (136 KB)
22 April 2014 at 21:50 GMT+2 Climate Concept Foundation (176 KB)