Call for input on the draft revision of the methodology AMS-II.D "Energy efficiency and fuel switching measures for industrial facilities"


The SSC WG seeks inputs on the top-down revision of the approved methodology AMS-II.D "Energy efficiency and fuel switching measures for industrial facilities"

The scope of the public input shall include but is not limited to issues specified in the information note "Questions for public inputs in relation to the top-down revision of AMS-II.D "Energy efficiency and fuel switching measures for industrial facilities", as contained in annex 7 of the report of the 40th meeting of the SSC WG.

The call for inputs from stakeholders was open from 08 May to 08 June 2013 (24:00GMT).

The input from this call will be considered at the forty-first meeting of the SSC WG.

Submission Date Submission
31 May 2013 at 12:19 GMT+2 Dinesh Aggarwal (88 KB)
08 June 2013 at 20:58 GMT+2 Rachel Child (310 KB)
08 June 2013 at 21:21 GMT+2 Thomas Grammig (66 KB)