Finalized requests for clarification on approved large scale methodologies

If you are a DOE, please log in to submit a new request. If you are not a DOE, please submit your request to the secretariat at sdm-ssu-methworkflows@unfccc.int.

To submit a request for clarification or revision of an approved SSC and A/R SSC methodology, please send an email to sdm-ssu-methworkflows@unfccc.int using the designated form.


Reference AM_CLA_
Text
Text is looked for in request titles only.
Concerned methodologies
Status
Panel/WG meeting
Only submissions considered during or after Meth Panel 43 may be searched with this criterion. No submissions were allocated for Meth Panels 47, 53, 70, 71, 74, 76, 79, 79, 80, 80, 84 or 84.

There are 311 matching requests:

Displaying 101-120 of 311

Reference Request for clarification Current Status Last update
AM_CLA_0211 Clarification on the meaning of "extreme values" when considering the measurements for the statistical analysis Final Response published 12 Sep 11
AM_CLA_0210 Clarification regarding the identification of the baseline alternative scenarios Final Response published 05 Sep 11
AM_CLA_0209 Clarification on a) definition of cogeneration, b) combination of cogeneration and process heat and c) whether hypothetical boiler can be the baseline Final Response published 17 Jun 11
AM_CLA_0208 Clarification on the determination of reference year v in projects applying ACM0013, Version 04.0.0 in China Final Response published 07 Jun 11
AM_CLA_0207 Applicability of the methodology for an existing project considering the activity starting date at the beginning of the operational phase. Final Response published 05 May 11
AM_CLA_0206 Use of Wood (non- residue biomass). Final Response published 05 May 11
AM_CLA_0205 Use of Refuse Derived Fuel (RDF) made from Municipal Solid Waste as an alternative fuel under this Methodology Final Response published 21 Apr 11
AM_CLA_0204 Clarification request on derivation of the moving average emission factor for the first campaign in case the date of registration of the project falls in between an ongoing campaign Final Response published 24 Mar 11
AM_CLA_0203 Lack of clarity of applicability of AM0029 Ver. 03 to combined cycle power plants utilising waste heat for public heating Final Response published 03 Feb 11
AM_CLA_0202 Request for clarification on Application of Barrier Due to Prevailing Practices, sub step 3 (a) (1) (c) of Annex 10, EB 39 Final Response published 24 Mar 11
AM_CLA_0201 Verification of total energy supplied by the generator through summation of electricity received by the recipient plants Final Response published 01 Mar 11
AM_CLA_0200 Location of the metering points for measurement of dry gas Final Response published 03 Feb 11
AM_CLA_0199 Inquiry regarding the applicability of ACM0014 to a baseline scenario with covered lagoons without biogas recovery Final Response published 24 Mar 11
AM_CLA_0198 Deviation request requirements for excluding abnormal campaigns from the operating condition campaigns for project activities registered under version 1, version 2, or version 3.4 of the methodology Final Response published 16 Feb 11
AM_CLA_0197 Clarification on applicability criteria 2 of ACM0003 version 07.3 Final Response published 24 Mar 11
AM_CLA_0196 Request for clarification regarding the cargo transportation Final Response published 16 Feb 11
AM_CLA_0195 Clarification for the project implemented by other entity under a tendered Build, Own and Operate (BOO) Scheme AND the tender organizer/ promoter is the project participant and owns the CERs. Final Response published 24 Mar 11
AM_CLA_0194 Clarification for the project implemented by other entity under a tendered Build, Own and Operate (BOO) Scheme AND the tender organizer/ promoter is the project participant and owns the CERs. Final Response published 24 Mar 11
AM_CLA_0193 Clarification request on the use of heat recovery steam generators to deliver steam to existing steam turbine generators for the generation of electricity from recovered heat Final Response published 11 Nov 10
AM_CLA_0192 Clarification request on the interpretation of the word ‘export’ in relation to methodology applicability criterion restricting export of electricity to the grid to a maximum of 10% Final Response published 11 Nov 10