Request for clarification on “Definition of grid”
(submitted 08 May 08):
AM_CLA_0097 (122 KB)
Negative emissions in grid connected electricity generation from renewable sources
(submitted 30 May 08):
AM_CLA_0103 (116 KB)
Treatment of installing experimental wind turbine in a registered CDM wind project
(submitted 10 Jul 08):
AM_CLA_0106 (131 KB)
Applicability to projects where a dam is built for irrigation and thus not a result of a CDM project activityApplicability to projects where a dam is built for irrigation and thus not a result of a CDM project activity
(submitted 11 Jul 08):
AM_CLA_0114 (146 KB)
Request for clarification on calculation of EGhistorical
(submitted 14 Oct 08):
AM_CLA_0130 (121 KB)
Clarification on data vintage if OM or BM emission coefficient is monitored ex-post
(submitted 04 Dec 06):
AM_CLA_0038 (122 KB)
The type of justification needed for not using the preferred Dispatch Analysis option for calculating the Operating Margin Emission Factor
(submitted 13 Dec 06):
AM_CLA_0037 (120 KB)
Calculation of power density
(submitted 07 Jun 07):
AM_CLA_0049 (116 KB)
Types of capacity additions to be included in the BM
(submitted 10 Aug 07):
AM_CLA_0054 (133 KB)
Applicability of ACM0002 to hydropower plants increasing electricity production through the diversion of water from further creeks into the reservoir without expansion of the installed power capacity
(submitted 28 Sep 07):
AM_CLA_0061 (134 KB)
Monitoring of non-condensible gas emissions
(submitted 01 Oct 07):
AM_CLA_0062 (112 KB)
Electricity generation projects resulting in emissions reductions in another non-Annex I country
(submitted 25 Jul 06):
AM_REV_0018 (127 KB)
Treatment of electricity exported from a project activity to a grid located in a different country
(submitted 19 Sep 06):
AM_REV_0026 (177 KB)
Approach for the exclusion of immaterial parts of a multinational grid
(submitted 26 Oct 06):
AM_REV_0027 (122 KB)
Enable the use of ACM0002 for power plants that result in emission reductions in another non-Annex I country because of the enhancement of dispatch of clean energy to that grid.
(submitted 31 Oct 06):
AM_REV_0029 (121 KB)
Determination of relevant electricity grid boundaries in India – state grid vs. regional grid vs. national grid
(submitted 27 Jul 05):
AM_CLA_0001 (146 KB)
Proposal to complement ACM002 and add a calculation of the amount of energy generated by the plants before the project.
(submitted 28 Jul 05):
AM_CLA_0002 (134 KB)
* Only the requests for clarification and revision that have been
clarified by the Meth Panel are displayed. To
view all requests for clarification,
go to this page. To view all requests for revision,
go to this page.