AM0009: Recovery and utilization of gas from oil wells that would otherwise be flared or vented --- Version 4.0

Submit comments for improvement of this methodology (please login)

Title Recovery and utilization of gas from oil wells that would otherwise be flared or vented (264 KB)

Tools referenced in this methodology:

Version number
4.0
Scale Large scale
Status Not Active (old version)
Validity Valid from 08 Apr 09 to 24 Nov 11
Sectoral scope(s) 10
Approval history NM0227 , NM0026
Revisions* Partial utilization of the recovered associated gas and/or gas-lift gas as one of the possible baseline scenarios (submitted 23 May 11): AM_REV_0217 (139 KB)
Inclusion of prior processing with mobile facilities and transport CNG to gas pipeline in AM0009 (submitted 06 Jun 11): AM_REV_0218 (142 KB)
Revision of AM0009 to expand its applicability to project activities which recovered gas is first compressed to CNG (Compressed Natural Gas), then transported via trailers or carriers, and later decompressed and gasified again, before it finally enters the gas pipelines to end-users. (submitted 07 Jun 11): AM_REV_0219 (159 KB)
Expand applicability of AM0009 V4 with new scenario (submitted 22 Aug 11): AM_REV_0222 (136 KB)
Previous Versions
Title Recovery and utilization of gas from oil wells that would otherwise be flared or vented --- Version 3 (275 KB)
Version number 3.3
Validity Valid from 14 Dec 07 to 07 Apr 09
Requests for registration can be submitted until 07 Dec 2009 23:59:59 GMT
Sectoral scope(s) 10
Clarifications* Confirmation that the “market” for recovered gas can be one fully controlled by the same legal entity recovering the gas (submitted 20 Feb 08): AM_CLA_0073 (115 KB)
Errors in equation 3 (submitted 11 Jun 08): AM_CLA_0107 (125 KB)
Clarifications on the algorithms of project emission calculations and on the guidance for uncertainty assessment within the monitoring methodology (submitted 14 Jul 08): AM_CLA_0118 (159 KB)
Clarifications on the scope of AM0009 in its stated purpose for the “recovery and utilization of gas from oil wells that would otherwise be flared”. (submitted 14 Jul 08): AM_CLA_0119 (146 KB)
Clarification on the term ‘Continuous measurement’ as stated for monitoring parameters m LPG,B,y and mCondensate,B,y (submitted 26 Nov 08): AM_CLA_0135 (118 KB)
Revisions* Inclusion of CNG, and combining associated and non-associated gas under AM0009 (submitted 24 Feb 08): AM_REV_0086 (130 KB)
AM0009 v3-rev “Recovery and utilization of gas from oil wells that would otherwise be flared or vented” (submitted 19 Sep 08): AM_REV_0109 (139 KB)
Approval history NM0227
Title Recovery and utilization of gas from oil wells that would otherwise be flared --- Version 2 (248 KB)
Version number 2.1
Validity Valid from 12 May 05 to 13 Dec 07
Requests for registration can be submitted until 13 Aug 2008 23:59:59 GMT
Sectoral scope(s) 10
Clarifications* Location of the metering points for measurement of dry gas (submitted 14 Nov 10): AM_CLA_0200 (145 KB)
Revisions* Applicability extension to process plants (submitted 21 Jul 06): AM_REV_0020 (161 KB)
Title Recovery and utilization of gas from oil wells that would otherwise be flared --- Version 1 (93 KB)
Version number 1.0
Validity Valid from 14 Jul 04 to 11 May 05
Sectoral scope(s) 10
Approval history NM0026

* Only the requests for clarification and revision that have been clarified by the Meth Panel are displayed. To view all requests for clarification, go to this page. To view all requests for revision, go to this page.