1. This document contains the amendments adopted by the Executive Board of the clean development mechanism (CDM) (hereafter referred to as the Board) at its seventy-fifth meeting, to the CDM validation and verification standard (VVS) (v.04.0) (CDM-EB65-A05-STAN). This document will be consolidated in a revised version of the VVS.
1. The following paragraphs shall read as follows:
299. A DOE shall request issuance of CERs for a PoA in accordance with the Project cycle procedure. The request shall correspond to all CPAs included in the PoA when a single monitoring report covering all CPAs of the PoAhas been published for the specified monitoring period. Where two monitoring reports are published for the specified monitoring period, a separate request for issuance corresponding to each of the monitoring reports shall be made. The monitoring periods shall be consecutive.
300 A request for issuance shall relate to the certified emission reductions verified as per the above.
- - - - -
Document information
Version |
Date |
Description |
|
||
01.0 |
4 October 2013 |
EB 75, Annex 05 Initial adoption. Amendment to the requirements for programme of activities including: · To enable two issuance requests for the same monitoring period; · To eliminate the requirement of minimum 90 days period between two issuance requests. This amendment shall be used together with CDM validation and verification standard (CDM-EB65-A04-STAN) version 04.0. |
Decision Class: Regulatory |