1. This document contains the amendments adopted by the Executive Board of the clean development mechanism (CDM) (hereinafter referred to as the Board) at its seventy-fifth meeting, to the CDM project standard (PS) (v.04) (CDM-EB65-A05-STAN). The document will be consolidated in a revised version of the PS.
1. The following paragraph shall read as follows:
239. The coordinating/managing entity shall:
(a) Maintain all monitoring results of all CPAs in accordance with the record keeping system identified in the registered PoA DD;
(b) Prepare, for each monitoring period, either a single monitoring report or two separate monitoring reports, whereby:
(i) In the case of a single monitoring report, the report shall ) contain all monitoring results of all CPAs included in the PoA;
(ii) In the case of two separate monitoring reports, each CPA shall only be included in one of the two monitoring reports and the two monitoring reports shall together contain all monitoring results of all CPAs included in the PoA (i.e. the two monitoring reports shall contain two mutually exclusive batches of CPAs);
(c) Request the issuance of CERs, tCERs or lCERs, through a DOE, as follows:
(i) In a single request, if only one monitoring report has been published covering all CPAs except for the case in paragraph 239(c)(ii) below; or
(ii) In two separate requests, if originally one monitoring report was published, but during the course of verification the CME decided to separate the monitoring results into two monitoring reports. In this case, two separate monitoring reports shall be prepared and submitted;
(iii) In two separate requests, if two separate monitoring reports are prepared by the CME;
(d) Separate the monitoring results of individual CPAs and group the monitoring results by CPA type defined by the relevant generic CPA DD;
(e) Make available the monitoring report and all monitoring results requested by a DOE for verification purposes.
- - - - -
Document information
Version |
Date |
Description |
|
||
01.0 |
4 October 2013 |
EB 75, Annex 04 Initial adoption. Amendment to the requirements for programme of activities including: · To enable two issuance requests for the same monitoring period. This amendment shall be used together with CDM project standard (CDM-EB65-A05-STAN) version 04.0. |
Decision Class:
Regulatory |