17:28 13 Feb 12
Clarifications - Methodology - Large Scale
This page provides access to clarifications relating to large scale Methodologies.
You may also want to reference other CDM-related documentation including: Procedures;
Tools; and Forms.
| Clarifications - Methodology - Large Scale | Version | EB | Annex | Paragraph |
|---|---|---|---|---|
Clarification on the approved consolidated methodology ACM0012 version 03.2 regarding CDM project activities that recover waste energy in greenfield facilities (124 KB) | 01 | 61 | 05 | |
Clarification to AM0034 (version 02): Catalytic reduction of N2O inside the ammonia burner of nitric acid plants (130 KB) | - | 51 | 12 | |
Type of GHGs to be considered in accounting for project and leakage emissions (153 KB) | - | 34 | - | 17 |
Eligibility of activities under the CDM (86 KB) | - | 33 | - | 30 |
Clarifications for project participants on when to request revision, clarification to an approved methodology or a deviation (124 KB) | 02.0 | 31 | 12 | - |
Reference to the Tool for the demonstration and assessment of additionality (84 KB) | - | 21 | - | 17 |
Negative emission reductions (88 KB) | - | 21 | - | 18 |
Thresholds and criteria for the eligibility of hydroelectric power plants with reservoirs as CDM project activities (102 KB) | - | 23 | 05 | - |
Consideration of national and/or sectoral policies and circumstances in baseline scenarios (113 KB) | 02.0 | 22 | 03 | - |
Use of regression analysis in methodologies (81 KB) | - | 21 | 07 | - |
Definition of biomass and consideration of changes in carbon pools due to a CDM project activity (23 KB) | - | 20 | 08 | - |
Projects requesting retroactive crediting (98 KB) | - | 19/20 | - | - |
Clarifications on the treatment of national and/or sectoral policies and regulations (paragraph 45 (e) of the CDM Modalities and Procedures) in determining a baseline scenario (Definitions) (119 KB) | 01.0 | 16 | 03 | - |
Further clarifications on methodological issues (20 KB)
B. Clarifications for describing a proposed new methodology and justifying the selection of the most appropriate approach from those contained in paragraph 48 of the CDM modalities and procedures C. Clarifications on the ex post calculation of baselines D. Link between baseline monitoring methodologies | - | 10 | 01 | - |
Further clarifications on methodological issues (13 KB)
B. Clarification on baseline methodologies for electricity generation CDM projects C. Guidance to the Methodologies Panel on formulating recommendations to the Board | - | 09 | 03 | - |
Issues relating to baseline and monitoring methodologies (100 KB)
B. Guidance on the approach contained in para. 48 c. of the CDM modalities and procedures for selecting baseline methodologies C. Proposed project activities applying more than one methodology D. Circumstances and modalities for operationalizing para. 47 of the CDM modalities and procedures E. Guidance regarding the treatment of "existing"and "newly built" facilities | - | 08 | 01 | - |

Clarification on the approved consolidated methodology ACM0012 version 03.2 regarding CDM project activities that recover waste energy in greenfield facilities