Project 3661 : Shaanxi Tongchuan Huachen 7MW CMM Power Generation Project
Project title Shaanxi Tongchuan Huachen 7MW CMM Power Generation Project
- project design document (1324 KB)

PDD appendices
Appendix 1 - ER_Shaanxi Tongchuan Huachen 7MWCMM Power Generation Project_20110328.xls (89 KB)
Appendix 2 - IRR_Shaanxi Tongchuan Huachen 7MWCMM Power Generation Project_20110329.xls (72 KB)


- registration request form (966 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (291 KB) authorization (291 KB)
Authorized Participants: Tongchuan City Huachen CMM Power Generation Co., Ltd.
Other Parties Involved Netherlands , involved indirectly approval (73 KB) authorization (73 KB)
Authorized Participants: Nuon Energy Trade & Wholesale
Sectoral scopes 8 : Mining/mineral production
10 : Fugitive emissions from fuels (solid, oil and gas)
Activity Scale LARGE
Methodologies Used ACM0008 ver. 7 - Consolidated methodology for coal bed methane, coal mine methane and ventilation air methane capture and use for power (electrical or motive) and heat and/or destruction through flaring or flameless oxidation
Standardized baselines used N/A
Amount of Reductions 157,444 metric tonnes CO2 equivalent per annum
Fee level USD 29988.8
Validation Report Validation report (1208 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 29/11/2011
Registration Date 01 Aug 11 (Date of registration action 28 Nov 11)   (view history)  
Crediting Period 01 Aug 11 - 31 Jul 18 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation