Project 3219 : SDIC Xiyang Baiyangling CMM to power generation project
Project title SDIC Xiyang Baiyangling CMM to power generation project
- project design document (899 KB)

PDD appendices
Appendix 1 - ER_Baiyangling CMM (82 KB)
Appendix 2 - IRR_Baiyangling CMM (137 KB)


- registration request form (508 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (2094 KB) authorization (2094 KB)
Authorized Participants: SDIC Xiyang Energy Co. Ltd.
Other Parties Involved United Kingdom of Great Britain and Northern Ireland , involved indirectly approval (321 KB) authorization (321 KB)
Authorized Participants: Camco Carbon Limited
Switzerland , involved indirectly approval (333 KB) authorization (333 KB)
Authorized Participants: Camco Carbon Limited
Sectoral scopes 8 : Mining/mineral production
10 : Fugitive emissions from fuels (solid, oil and gas)
Activity Scale LARGE
Methodologies Used ACM0008 ver. 6 - Consolidated methodology for coal bed methane, coal mine methane and ventilation air methane capture and use for power (electrical or motive) and heat and/or destruction through flaring or flameless oxidation
Standardized baselines used N/A
Amount of Reductions 449,997 metric tonnes CO2 equivalent per annum
Fee level USD 88499.4
Validation Report Validation report (835 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 12/03/2012
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 16/07/2012
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 06/07/2012
MoC Annex 2 (Add Project Participant) valid as of 13/04/2011
Registration Date 10 Dec 10   (view history)  
Crediting Period 10 Dec 10 - 09 Dec 20 (Fixed)
Requests for Issuance
and related documentation