Project 3200 : Qinxin CMM Power Generation Project
Project title Qinxin CMM Power Generation Project
- project design document (1597 KB)

PDD appendices
Appendix 1 - Enclosure (147 KB)
Appendix 2 - Enclosure 1 (29 KB)


- registration request form (314 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (101 KB) authorization (101 KB)
Authorized Participants: Qinxin Methane Power Generation Co., Ltd.
Other Parties Involved United Kingdom of Great Britain and Northern Ireland , involved indirectly approval (100 KB) authorization (100 KB)
Authorized Participants: Trading Emissions PLC (withdrawn as of 24/11/2016)
Sectoral scopes 8 : Mining/mineral production
10 : Fugitive emissions from fuels (solid, oil and gas)
Activity Scale LARGE
Methodologies Used ACM0008 ver. 5 - Consolidated methodology for coal bed methane, coal mine methane and ventilation air methane capture and use for power (electrical or motive) and heat and/or destruction through flaring or flameless oxidation
Standardized baselines used N/A
Amount of Reductions 158,269 metric tonnes CO2 equivalent per annum
Fee level USD 30153.8
Validation Report Validation report (673 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 12/03/2012
MoC Annex 2 (Withdraw Project Participant) valid as of 24/11/2016
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 07/03/2012
Registration Date 13 Oct 10   (view history)  
Crediting Period 13 Oct 10 - 12 Oct 17 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation