Verify and Certify ERs of a CDM project activity

In accordance with the modalities and procedures for a CDM Decision 3/CMP.1 (735 KB):

"61. Verification is the periodic independent review and ex post determination by the designated operational entity of the monitored reductions in anthropogenic emissions by sources of greenhouse gases that have occurred as a result of a registered CDM project activity during the verification period. Certification is the written assurance by the designated operational entity that, during a specified time period, a project activity achieved the reductions in anthropogenic emissions by sources of greenhouse gases as verified.

62. In accordance with the provisions on confidentiality in paragraph 27 h) (735 KB) , the designated operational entity contracted by the project participants to perform the verification shall make the monitoring report publicly available, and shall:

(a) Determine whether the project documentation provided is in accordance with the requirements of the registered project design document and relevant provisions of decision 17/CP.7, the present annex and relevant decisions of the COP/MOP;

(b) Conduct on-site inspections, as appropriate, that may comprise, inter alia, a review of performance records, interviews with project participants and local stakeholders, collection of measurements, observation of established practices and testing of the accuracy of monitoring equipment;

(c) If appropriate, use additional data from other sources;

(d) Review monitoring results and verify that the monitoring methodologies for the estimation of reductions in anthropogenic emissions by sources have been applied correctly and their documentation is complete and transparent;

(e) Recommend to the project participants appropriate changes to the monitoring methodology for any future crediting period, if necessary;

(f) Determine the reductions in anthropogenic emissions by sources of greenhouse gases that would not have occurred in the absence of the CDM project activity, based on the data and information derived under subparagraph (a) above and obtained under subparagraph (b) and/or (c) above, as appropriate, using calculation procedures consistent with those contained in the registered project design document and in the monitoring plan;

(g) Identify and inform the project participants of any concerns related to the conformity of the actual project activity and its operation with the registered project design document. Project participants shall address the concerns and supply relevant additional information;

(h) Provide a verification report to the project participants, the Parties involved and the Executive Board. The report shall be made publicly available.

63. The designated operational entity shall, based on its verification report, certify in writing that, during the specified time period, the project activity achieved the verified amount of reductions in anthropogenic emissions by sources of greenhouse gases that would not have occurred in the absence of the CDM project activity. It shall inform the project participants, Parties involved and the Executive Board of its certification decision in writing immediately upon completion of the certification process and make the certification report publicly available".