Project 10328 : Small Hydroelectric Power Plants Projects: São Pedro, Carangola, Calheiros, São Simão, Funil, São Joaquim, Fumaça IV, Jataí, Irara, Bonfante, Monte Serrat, Santa Fé, hereafter referred to as group (“bundling”).
Project title Small Hydroelectric Power Plants Projects: São Pedro, Carangola, Calheiros, São Simão, Funil, São Joaquim, Fumaça IV, Jataí, Irara, Bonfante, Monte Serrat, Santa Fé, hereafter referred to as group (“bundling”).
- project design document (648 KB)

PDD appendices
Appendix 1 - Eletrobras_Estimated CERs_v 5_2016 05 30.xls (86 KB)
Appendix 2 - WACC ElectricGen_2004.xlsx (267 KB)
Appendix 3 - Eletrobras_FCF_v.2.xls (347 KB)


- registration request form (183 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties Brazil , involved indirectly approval (82 KB) authorization (82 KB)
Authorized Participants: Centrais Elétricas Brasileiras S/A – ELETROBRÁS ; São Pedro Energia S/A ; Carangola Energia S/A ; São Simão Energia S/A ; Funil Energia S/A ; São Joaquim Energia S/A ; Caparaó Energia S/A ; Jataí Energética S/A ; Irara Energética S/A ; Bonfante Energética S/A ; Monte Serrat Energética S/A ; Santa Fé Energética S/A ; Calheiros Energia S/A
Other Parties Involved n/a
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 16 - Grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 650,438 metric tonnes CO2 equivalent per annum
Fee level USD 128587.6
Validation Report VVS/VVM version: VVS 9.0
Validation report (1644 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
Registration Date Rejected   (view history)   completeness check: complete info & rep check: concluded
Crediting Period 13 Oct 16 - 12 Oct 26 (Fixed)