Finalized requests for deviation

In accordance with the current Procedures for requests for deviation a Designated Operation Entity may submit request for deviation regarding a project activity at the validation or verification stage.

Requests for deviation by DOEs and the responses provided by the Board are being made publicly available on this page, unless otherwise decided. The requests for deviations from the monitoring plan have the following code "I-DEV0XXX" and the deviations from an approved methodology have the following code "M-DEV0XXX".

If you are a DOE, please log in if you wish to submit a new request.


Reference of deviation request I/M-DEV
Type of request
Status
Concerned methodology
Reference of project (for requests at verification)

There are 327 matching requests:

Displaying 61-80 of 327

Reference Request for deviation Current Status Last update
I-DEV0401 Deviation related to the monitoring of the energy consumed for the Cuidad Juarez landfill gas to energy project activity Deviation accepted 09 Sep 11
I-DEV0400 Deviation related to the monitoring of the energy consumed for the Cuidad Juarez landfill gas to energy project activity Deviation accepted 09 Sep 11
I-DEV0398 Calculation of BFi,y: Quantity of biomass combusted in the project plant based on indirectly measured data. Deviation accepted 23 May 11
I-DEV0397 Deviation from the monitoring plan of the registered PDD :Change of monitoring frequency of parameters ‘heat rate’ and ‘combustion efficiency’ Deviation accepted 09 Jun 11
M-DEV0396 Deviation to comply with the Proced. for renewal of the crediting period (EB 46 annex 11) Deviation accepted 15 Apr 11
I-DEV0395 The method of measurement of monitoring parameter Operating Hour of Plant (OH) calculated from operating temperature of reactor based measurement to Ammonia flow to Reactor based measurement Deviation accepted 08 Nov 11
M-DEV0394 Deviation from methodology AM0009 (V.04) in order to include emissions from CNG transportation by trailer after the processing facility in project emissions Deviation not accepted 18 Apr 11
I-DEV0393 Deviation from the Monitoring Plan regarding alternative sludge final use and indirect monitoring; and Chemical Oxygen Demand monitoring frequency Deviation accepted 07 Apr 11
I-DEV0392 Monitoring of diesel consumption Deviation accepted 15 Apr 11
I-DEV0391 Deviation from Monitoring Plan for parameters (a) volume of wastewater treated and (b) electricity consumed by project activity equipment Deviation accepted 15 Feb 11
M-DEV0390 Contractual requirement to enable a fuel switch to a primary fuel other than natural gas during the gas supply interruption situation or emergency situation Deviation not accepted 10 Feb 11
I-DEV0388 Guidance regarding acceptability of deviation related to the monitoring procedure of the parameters EGGEN : Total electricity generated and EGAUX : Auxiliary consumption of electricity Deviation accepted 28 Dec 10
I-DEV0387 Deviation about measure of total landfill gas flow Deviation accepted 28 Dec 10
I-DEV0386 Measurement of the generation output of the HFO plant Deviation accepted 04 Jan 11
M-DEV0385 This deviation is requested in order to expand the first applicability criterion of the approved methodology AM0042 - “Grid-connected electricity generation using biomass from newly developed dedicated plantations”, version 02.1, pg 2 -, to which the PDD for the UTE Rondon II project (which is in the validation phase) is to comply. The aforementioned criterion demands that “the project activity involves the installation of a new grid-connected power plant that is mainly fired with renewable biomass from a dedicated plantation (fossil fuels or other types of biomass may be co-fired)”. Deviation accepted 17 Jan 11
I-DEV0384 Deviation to the measuring of total flow of LFG Deviation accepted 17 Dec 10
I-DEV0383 Deviation from Monitoring Plan for parameters (a) volume of wastewater treated and (b) electricity consumed by project activity equipment Deviation accepted 21 Dec 10
I-DEV0382 Deviation from Monitoring Plan for parameters (a) volume of wastewater treated and (b) electricity consumed by project activity equipment Deviation accepted 21 Dec 10
I-DEV0381 Deviation from Monitoring Plan for parameters (a) volume of wastewater treated and (b) electricity consumed by project activity equipment Deviation accepted 21 Dec 10
I-DEV0380 Deviation from Monitoring Plan for parameters (a) electricity consumed by project activity equipment “EGy,consumed,elec”, and (b) COD measurement for the wastewater discharged to the open channel from the last pond of the existing lagoon system “CODy,ww,treated”. Deviation accepted 21 Dec 10