I-DEV0436: Deviations in the LFG collection and utilization project activity adopting AM0011: Improper monitoring of LFG flow / lack of engine CH4 combustion efficiency and lack of flare operational conditions

Reference I-DEV0436
Submitted by GLC (18 Apr 2012)
Project activity 37: Rio Azul landfill gas and utilization project in Costa Rica
Selected monitoring period 18 Aug 2004 - 30 Dec 2010
Title/subject of deviation Deviations in the LFG collection and utilization project activity adopting AM0011: Improper monitoring of LFG flow / lack of engine CH4 combustion efficiency and lack of flare operational conditions
Description
Due to the limitations of the web-based interface and the complexity of the Request for Deviation no text is entered here.

Please refer to the corresponding section (pages 2 to 21) of the attached document "Req f Dev Rio Azul LFG_UNFCCC 0037_final.pdf"
Assessment
Due to the limitations of the web-based interface and the complexity of the Request for Deviation no text is entered here.

Please refer to the corresponding section (pages 21 to 25) of the attached document "Req f Dev Rio Azul LFG_UNFCCC 0037_final.pdf"
Impact
Due to the limitations of the web-based interface and the complexity of the Request for Deviation no text is entered here.

Please refer to the corresponding section (page 25) of the attached document "Req f Dev Rio Azul LFG_UNFCCC 0037_final.pdf"
Annexes Pictorial Chronology Rev 4 (2386 KB)
Rio_Azul_ER_calculations_15Feb2012.zip (43 MB)
Req f Dev Rio Azul LFG_UNFCCC 0037_final (322 KB)
Link to the documentation made available at validation stage or monitoring report Link to relevant documentation
Signed form Signed form (592 KB)
Decision This request for deviation has been accepted.

The Chairs have accepted the proposed request for deviation to the monitoring and reporting process for the first monitoring period, from 18 August 2004 to 30 December 2010.

Current status 27 Jun 2012 - Deviation accepted
Historic statuses 01 Sep 2011 - Submission received
29 Sep 2011 - Submission deemed incomplete
23 Dec 2011 - Resubmission received
17 Jan 2012 - Submission deemed incomplete
18 Apr 2012 - Resubmission received
16 May 2012 - Successfully passed the Completeness Check
12 Jun 2012 - Awaiting EB decision