Sichuan Jiujiapeng Hydropower Project
Host party(ies) China
Methodology(ies) ACM0002 ver. 11
Estimated annual reductions* 49,904
DOE/AE Lloyd’s Register Quality Assurance Ltd.
Period for comments 07 Jul 10 - 05 Aug 10
PP for which DOE have a contractual obligation Carbon Asset Management Sweden AB
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (349 KB)
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs