Eco-friendly manufacturing of Autoclaved Aerated Concrete blocks by using flyash at “Indo Bhutan Construction Solutions (P) Ltd”
[]
Host party(ies) India
Methodology(ies) AMS-III.Z. ver. 5
Standardised Baselines N/A
Estimated annual reductions* 35,574
Start date of first crediting period. 01 Apr 15
Length of first crediting period. 10 years
DOE/AE Earthood Services Private Limited
Period for comments 12 Oct 14 - 10 Nov 14
PP(s) for which DOE have a contractual obligation Indo Bhutan Constructions Solutions Private Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1285 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs