102 MW Gulpur Hydropower Project
[]
Host party(ies) Pakistan
Methodology(ies) ACM0002 ver. 17
Standardised Baselines N/A
Estimated annual reductions* 257,022
Proposed start date of PA 07 Aug 15
Start date of first crediting period. 30 Oct 19
Length of first crediting period. 7 years
DOE/AE Bureau Veritas India Pvt. Ltd.
Period for comments 23 Dec 17 - 21 Jan 18 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation Mira Power Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (3496 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs