Recovery and Utilization of Associated Gas to Optimize Power Generation at PETROAMAZONAS Block 15 Facilities
Host party(ies) Ecuador
Methodology(ies) AM0009 ver. 4
Estimated annual reductions* 145,652
DOE/AE DNV Climate Change Services AS
Period for comments 09 Jun 10 - 08 Jul 10
PP for which DOE have a contractual obligation Tricorona Carbon Asset Management Pte Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (611 KB)
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs