Duanwang CMM Power Generation Project
Host party(ies) China
Methodology(ies) ACM0008 ver. 6
Estimated annual reductions* 130,002
DOE/AE ERM Certification and Verification Services Limited
Period for comments 07 Jul 10 - 05 Aug 10
PP for which DOE have a contractual obligation Equity + Environmental Assets Ireland Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1678 KB)
Submission of comments to the DOE/AE Compilation of submitted inputs:
Comment (n/a) submitted by: CMM Shanxi on behalf of CMMinShanxi

Comment (n/a) submitted by: CMM Shanxi on behalf of CMMinShanxi

Comment (29 KB) submitted by: CMM Shanxi on behalf of CMMinShanxi


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs