Guangxi Longsheng Lejiang Hydropower Project
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 13
Estimated annual reductions* 16,228
DOE/AE Lloyd’s Register Quality Assurance Ltd.
Period for comments 10 Jul 09 - 08 Aug 09
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (351 KB)
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs