Hubei Enshi Qinglonghu Hydropower Station Project
Host party(ies) China
Methodology(ies) ACM0002 ver. 10
Estimated annual reductions* 98,510
DOE/AE ERM Certification and Verification Services Limited
Period for comments 14 Jan 10 - 12 Feb 10
PP for which DOE have a contractual obligation Arreon Carbon UK Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (600 KB)
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs