Waste Heat Recovery and Utilisation for Power Generation Project of Jiande Conch Cement Company Limited (Phase II)
Host party(ies) China
Methodology(ies) ACM0012 ver. 3
Estimated annual reductions* 39,125
DOE/AE DNV Climate Change Services AS
Period for comments 01 Jul 10 - 30 Jul 10
PP for which DOE have a contractual obligation Camco International Ltd. (Camco Carbon Limited)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (714 KB)
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs