Luogu 10MW Hydropower Station Project in Sichuan Province
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 15
Estimated annual reductions* 37,880
DOE/AE TÜV NORD CERT GmbH
Period for comments 01 Apr 10 - 30 Apr 10
PP for which DOE have a contractual obligation Carbon Asset Management Sweden AB
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (746 KB)
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs