Flare Gas Recovery in Tabriz Oil Refinery
[]
Host party(ies) Iran (Islamic Republic of)
Methodology(ies) AMS-III.P.
Standardised Baselines N/A
Estimated annual reductions* 30,371
Proposed start date of PA 15 Dec 14
Start date of first crediting period. 01 Sep 16
Length of first crediting period. 10 years
DOE/AE KBS Certification Services Limited
Period for comments 05 Feb 16 - 05 Mar 16 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation PIELDS Engineering Co. Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1250 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs