Chongqing Jinjiu Cement 4.5MW Waste Heat Recovery as Power Project
Host party(ies) China
Methodology(ies) AMS-III.Q. ver. 3
Estimated annual reductions* 20,725
DOE/AE DNV Climate Change Services AS
Period for comments 07 Jul 10 - 05 Aug 10
PP for which DOE have a contractual obligation OneCarbon International B.V.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1136 KB)
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs