Thuan Nhien Phong Wind Power Project
[]
Host party(ies) Viet Nam
Methodology(ies) ACM0002 ver. 12
Standardised Baselines N/A
Estimated annual reductions* 53,737
Start date of first crediting period. 01 Apr 13
Length of first crediting period. 7 years
DOE/AE Colombian Institute for Technical Standards and Certification
Period for comments 14 Apr 12 - 13 May 12
PP(s) for which DOE have a contractual obligation Vitol S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (825 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs