Arranging CERs throughCDM over Mango/Cashew/Indian Gooseberry plantations
[]
Host party(ies) India
Methodology(ies) AR-ACM0003
Standardised Baselines N/A
Estimated annual reductions* 1,930,926
Start date of first crediting period. 13 Feb 14
Length of first crediting period. 30 years
DOE/AE TUEV-RHEIN
Period for comments 11 Apr 13 - 25 May 13
PP(s) for which DOE have a contractual obligation Orissa Horticulture Development Society(OHDS)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1312 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
1.How does the Project Owner demonstrate that the woody biomass used in the baseline scenario is non-renewable biomass?

2.How does the Project Owner states that the methodology is applicable, considering that, in the region of Orissa, the biomass consumed for cooking is non-renewable biomass?

3. The DOE/PP  is requested to further explain how it has validated the input values to the investment analysis

4.It is not clear whether the input values were available at the time of the investment decision in line with the EB51 Annex 58 paragraph 6, in particular:

(i) The O&M cost for the baseline scenario
(ii) The installation cost for monitoring system;
(iii) The methane production in terms of m3/h.

5. This is a large scale project and PP has not included the 2% CER sharing plan as insisted by the DNA.PP should follow the rules of DNA as insisted.DOE to kindly collect and verify the evidences of the stakeholder's meeting, ensure the 2% CER sharing is discussed with the stakeholders in the meeting . 

6. The lifetime of the project is not provided in the PDD.

7.It is said in the PDD section A.1, that Orissa is the poorest indian state  whose 60% population relies on agriculture ,please clarify how this project will cater to the infrastructure needs of the common villagers?

Submitted by: Ram

Comment (254 KB) submitted by: Bikash Rath on behalf of Regional Centre for Development Cooperation(RCDC), Bhubaneswar, Odisha, India