Waste Heat Recovery based power generation at JKLCL Durg
[]
Host party(ies) India
Methodology(ies) ACM0012 ver. 6
Standardised Baselines N/A
Estimated annual reductions* 51,088
Proposed start date of PA 19 May 16
Start date of first crediting period. 01 Jul 17
Length of first crediting period. 10 years
DOE/AE KBS Certification Services Limited
Period for comments 18 Apr 17 - 17 May 17 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation JK Lakshmi Cement Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1267 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs