Sichuan Huadian Xixi River Hydro-electricity Development Co., Ltd. Diluo Hydroelectric Project
[]
Host party(ies) China
Methodology(ies) ACM0002 ver. 11
Standardised Baselines N/A
Estimated annual reductions* 338,610
Start date of first crediting period. 01 Jan 11
Length of first crediting period. 7 years
DOE/AE LRQA Ltd
Period for comments 05 Mar 10 - 03 Apr 10
PP(s) for which DOE have a contractual obligation EcoSecurities International Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (528 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE Compilation of submitted inputs:
The project was in operation since Dec. 26, 2009. Yearly power generation would be 445,000 MWh. The situation is different as reflected in PDD.
Submitted by: shuidian


The comment period is over.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs