Wind power project in Gujarat by Kaze Energy Limited
[]
Host party(ies) India
Methodology(ies) ACM0002 ver. 18
Standardised Baselines N/A
Estimated annual reductions* 109,044
Proposed start date of PA 22 Dec 16
Start date of first crediting period. N/A
Length of first crediting period. 7 years
DOE/AE LGAI Technological Center, S.A.
Period for comments 31 Jul 18 - 29 Aug 18 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation Kaze Energy Limited
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1361 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs