POLAR VERTIX 3.2 MW BIOMASS ENERGY PLANT FOR ON-SITE USE
Host party(ies) Malaysia
Methodology(ies) ACM0006 ver. 6
Estimated annual reductions* 10,681
DOE/AE DNV Climate Change Services AS
Period for comments 16 May 08 - 14 Jun 08
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs

The content you see inside this frame is located outside the UNFCCC CDM Website. If you have problems viewing the content in the frame, click here to access the web site directly.
   
UNFCCC Secretariat assumes no responsibility for the third-party content linked through its website