Flare Gas Recovery in Sarkhoon and Qeshm Gas Treating Company
[]
Host party(ies) Iran (Islamic Republic of)
Methodology(ies) AMS-III.BI.
Standardised Baselines N/A
Estimated annual reductions* 52,431
Start date of first crediting period. 01 Sep 14
Length of first crediting period. 10 years
DOE/AE SGS-UKL
Period for comments 08 Mar 14 - 06 Apr 14
PP(s) for which DOE have a contractual obligation Research Institute for Petroleum Industry (RIPI)
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (589 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs