Liuyang Shuangjiangkou, Renziqiao and Hedong 6.4MW Bundled Hydropower Project
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 11
Estimated annual reductions* 26,183
DOE/AE TÜV NORD CERT GmbH
Period for comments 18 Jul 07 - 16 Aug 07
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs

The content you see inside this frame is located outside the UNFCCC CDM Website. If you have problems viewing the content in the frame, click here to access the web site directly.
   
UNFCCC Secretariat assumes no responsibility for the third-party content linked through its website