70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL-16-01)
[]
Host party(ies) India
Methodology(ies) ACM0002 ver. 17
Standardised Baselines ASB0007 ver 01.0 - Standardized baseline: Grid emission factor for the electricity system of the Republic of Armenia
Estimated annual reductions* 148
Proposed start date of PA 29 Jul 16
Start date of first crediting period. 31 Oct 17
Length of first crediting period. 7 years
DOE/AE LGAI Technological Center, S.A.
Period for comments 03 Dec 16 - 01 Jan 17 (23:59:59 GMT)
PP(s) for which DOE have a contractual obligation Fortum FinnSurya Energy Pvt. Ltd.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (642 KB)
Local stakeholder consultation report: N/A
Impact assessment summary: N/A
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs