Small scale grid connected hydroelectric project in El Carmelo Piping, Iquique
Host party(ies) Chile
Methodology(ies) AMS-I.D. ver. 15
Estimated annual reductions* 10,897
DOE/AE TÜV NORD CERT GmbH
Period for comments 16 Jan 10 - 14 Feb 10
PP for which DOE have a contractual obligation Enernuevas S.A.
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (645 KB)
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs