Qinghai Golmud Yixiantian 8MW Small Scale Hydropower Project
Host party(ies) China
Methodology(ies) AMS-I.D. ver. 12
Estimated annual reductions* 25,619
DOE/AE Lloyd’s Register Quality Assurance Ltd.
Period for comments 03 Nov 07 - 02 Dec 07
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs

The content you see inside this frame is located outside the UNFCCC CDM Website. If you have problems viewing the content in the frame, click here to access the web site directly.
   
UNFCCC Secretariat assumes no responsibility for the third-party content linked through its website