25 MW biomass based power plant in Lahad Datu in Sabah, Malaysia
Host party(ies) Malaysia
Methodology(ies) ACM0006 ver. 6
Estimated annual reductions* 123,845
DOE/AE TÜV Rheinland (China) Ltd.
Period for comments 20 Jan 09 - 18 Feb 09
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (1261 KB)
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs