8 MW waste heat recovery based captive power project at Jain Steel and Power Ltd., Orissa
Host party(ies) India
Methodology(ies) AMS-III.Q. ver. 2
Estimated annual reductions* 46,459
DOE/AE Bureau Veritas Certification Holding SAS
Period for comments 27 Oct 09 - 25 Nov 09
The operational/applicant entity working on this project has decided to make the Project Design Document (PDD) publicly available directly on the UNFCCC CDM website.
PDD PDD (2224 KB)
Submission of comments to the DOE/AE
The comment period is over.
No comments received.
* Emission reductions in metric tonnes of CO2 equivalent per annum that are based on the estimates provided by the project participants in unvalidated PDDs