03:07 29 Mar 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
12821-12840
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
Conveyorised transportation of dry bulk cargo from jetty to warehouse and directly on bagging plant… | Adani | India | 03 Apr 2009 |
Utilization of regenerative power produced from cranes installed at Mundra Port and Special Economic Zone Ltd. | Adani | India | 03 Apr 2009 |
CDM project Lion Blast Furnace | Mitsubishi Corporation | Malaysia | 03 Apr 2009 |
Energy Efficient Illumination within the Port | Adani | India | 03 Apr 2009 |
8MW Waste Heat Recovery based power project at Yerabanahally village, Sandur taluk, Bellary district of the state of Karnataka | KMMI STEEL PRIVATE LIMITED | India | 03 Apr 2009 |
Biomass based thermal energy generation at Saber Papers Limited | Saber Papers Ltd. | India | 03 Apr 2009 |
Wind Power Project in Maharashtra by Ms Air Control India Pvt. Ltd. | Air Control India Pvt Ltd. | India | 03 Apr 2009 |
49.5 MW wind farm project situated in KHUTI KUN, MIRPURSAKRO, DISTRICT THATTA , PROVINCE OF SINDH, PAKISTAN | Green Power (Pvt) Ltd | Pakistan | 02 Apr 2009 |
Wind farm in the Bogampatti Village, Palladam Taluk, Coimbatore District in the state of Tamilnadu in India | East India Minerals Limited | India | 02 Apr 2009 |
Dahao Wind Power project | China Resources Wind Power Development Co., Ltd. | China | 02 Apr 2009 |
Implementation of wood based boiler at Stretchline Holdings | Stretchline | Sri Lanka | 02 Apr 2009 |
Green Power Pvt Ltd wind project situated in KHUTI KUN, MIRPURSAKRO, DISTRICT THATTA , PROVINCE OF SINDH, PAKISTAN | Green Power (Pvt) Ltd | Pakistan | 02 Apr 2009 |
Energy efficiency initiative of KDHP by replacing ICLs with CFLs at Munnar, Kerala state, India | Kanan Devan Hills Plantations Company Private Limited | India | 02 Apr 2009 |
Bio Mass based Steam Boiler Project at Hayleys MGT Knitting Mills PLC | Hayleys MGT Knitting Mills PLC | Sri Lanka | 02 Apr 2009 |
Inner Mongolia Bayinxile Wind Power Project | China Resources Wind Power Development Co., Ltd. | China | 02 Apr 2009 |
The Adoro S.A slaughterhouse Methane Avoidance Project Activity | AMBIO Soluções Ambientais | Brazil | 01 Apr 2009 |
Energy efficiency measures project at Kalina C and D of Ivory Property Trust | Ivory Property Trust | India | 01 Apr 2009 |
Energy Saving Power Supply Panels for illumination within the Port | ADAMO Mundra Port and Special Economic Zone Limited | India | 31 Mar 2009 |
CDM Project being set up by Indus Smelters Ltd. at Plot No. 436B, 453 and 454B Sector C Urla Industrial Area, Raipur C.G. | Indus Smelters Ltd. | India | 31 Mar 2009 |
Bundle of fuel switching from coal to palm kernel shell at Siswo Bangun Starch Plant, Indonesia | South Pole Carbon Asset Management | Indonesia | 31 Mar 2009 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: