Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 617 | 618 | 619 | 620 | 621 | ... 669 >>
Displaying 12361-12380 of 13375 notifications.
Project Title Entity Name Host Party Date Received
110 MW natural gas powered cogeneration plant at Koke-yae 2 Gulf JP Company Limited Thailand 14 Jul 2009
6.25 MW wind power project by VELATAL SPINNING MILLS PVT LTD VELATAL SPINNING MILLS PVT LTD India 14 Jul 2009
Fuel switch project at Uttar Pradesh, India by Vimal Organics Limited Vimal Organics Limited India 13 Jul 2009
Fuel switch project at Uttar Pradesh 2 by Vimal Organics Limited Vimal Organics Limited India 13 Jul 2009
replacement of approximately 2.6 million energy inefficient incandescent light bulbs (“ICLs”) with energy efficient compact fluorescent light bulbs (“CFLs”) in approximately 650,000 households in the Indian Railway Quarters C-Quest Capital Malaysia Limited India 13 Jul 2009
fuel switch project at Uttar Pradesh 4 by Vimal Organics Limited Vimal Organics Limited India 13 Jul 2009
Fuel switch project 3 by Vimal Organics Limited Vimal Organics Limited India 13 Jul 2009
Natural Gas based combined heat & power generation by H & R Johnson (India) Ltd. H.&R. Johnson (India) Limited India 13 Jul 2009
1.0MW Biogas based plant in Kuala Sungai Baru BELL Group of Companies Malaysia 13 Jul 2009
96 MW NAFRA Hydroelectric Power Project SEW INFRASTRUCTURE LTD. India 11 Jul 2009
0.6 MW Wind Power Project. Hyderabad Castings Limited India 11 Jul 2009
TACNA SAMA WIND FARM SoWiTec trading GmbH Peru 10 Jul 2009
Efficient Bagasse based Co-Generation Project at Shri Duhganga Vedganga S.S.K. Ltd. Shri Dudhganga Vedganga S.S.K.Ltd. India 10 Jul 2009
1.6 MW (800kw x 2WTGs) Wind Power Project in Rajasthan Manjeet Cotton Pvt Ltd India 10 Jul 2009
15 MW Wind Power Project in Ratan ka Bass, Jodhpur, Rajasthan KS Oils Ltd. India 10 Jul 2009
Efficient Bagasse based Co-generation project at Shri Dughhanga Shri Dudhganga Vedganga S.S.K.Ltd. India 10 Jul 2009
10MW Multifuel based power project by Satia Industries Limited Satia Industries Limited India 10 Jul 2009
Bonito Wind Farm Sowitec trading GmbH Brazil 10 Jul 2009
2 X 2.5 MW Sainj Hydro-electric Project (HEP) implemented in Shimla district of Himachal Pradesh Himshakti Project Private Ltd India 09 Jul 2009
Methane Recovery and Energy generation project by Thai Bio Energy Co. Ltd Thai Bio Energy Co.,Ltd. Thailand 09 Jul 2009