Prior Consideration of the CDM


** Important Announcement **

As per para 5(b) of CDM EB 118 meeting report, which reads as below:

"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"

We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Search Criteria
Date Received from: to:
* format DD/MM/YYYY
Host Party
Project Title
<< 1 ... | 615 | 616 | 617 | 618 | 619 | ... 669 >>
Displaying 12321-12340 of 13375 notifications.
Project Title Entity Name Host Party Date Received
0.6 MW Suzlon make Model S-52 WTG at Site Survey No. 731 P ,Village Visawada Amsal Chem Pvt. Ltd.. India 18 Jul 2009
2.5 MW run of river mini hydro project in Prafi Kantor Pusat Indonesia 17 Jul 2009
IA HIAO Small Hudro Power Plant Fichtner Carbon Management GmbH for LICOGI 12 JSC Viet Nam 17 Jul 2009
50.4 MW project at Belgaum distrct in the state of Karnataka, India EN Renewable Energy Pvt. Ltd. India 17 Jul 2009
Combined Heat and Power Project Combined Heat & Power Company Limited Thailand 17 Jul 2009
96 MW NAFRA Hydroelectric Power Project Sew Nafra Power Corporation Private Limited (SVP of SEW Energy Limited) India 17 Jul 2009
Saraburi A Cogeneration Project Saraburi A Cogeneration Company Limited Thailand 17 Jul 2009
Industrial Cogen Project Industrial Cogen Company Limited Thailand 17 Jul 2009
1 MW run of river mini hydro project in Ndungga Kantor Pusat Indonesia 17 Jul 2009
1 MW run of river mini hydro project in Santong Kantor Pusat Indonesia 17 Jul 2009
0.6 MW Suzlon make (Model S-52) WTG at Site (WTG exact location no.), Village Visawada, Taluka Porbandar District Porbandar (State Gujarat) Amsal Chem Private Limited India 17 Jul 2009
Saraburi B Cogeneration Project Saraburi B Cogeneration Company Limited Thailand 17 Jul 2009
Electricity generation from bundled wind energy project activity aggregated by Resurge Energy Private Limited – VII M/s Param Exports India 17 Jul 2009
6.25 MW (1.25 MW X 5 Nos.) bundled wind power project in Maharashtra M/s. Hotel Golden Emerald India 16 Jul 2009
Arbolito de la Costa Wind Farm SoWiTec trading GmbH Uruguay 16 Jul 2009
Castillos Norte Wind Farm SoWiTec trading GmbHSoWiTec trading GmbH Uruguay 16 Jul 2009
0.6 MW wind power project.by Gujarat Gems Pvt. Ltd. Gujarat Gems Pvt. Ltd. India 16 Jul 2009
“Cooperativa Rural de Electrificación (CRE)” Power Electrical Renewable Generation “Yane-1” CRE Ltda. Bolivia 16 Jul 2009
7 MW bundeld Hydro Power Project in Chamba District of Himachal Pradesh Raajratna Energy Holdings Private Limited India 16 Jul 2009
12 MW Biomass based Power Project at Sanchore (Rajasthan) Transtech Green Power Private Limited, TGPPL India 16 Jul 2009