10:04 23 Apr 24
Prior Consideration of the CDM
** Important Announcement **
As per para 5(b) of CDM EB 118 meeting report, which reads as below:
"Cease receiving requests under the temporary measures when the process for submission of transition requests to the secretariat, under the Article 6.4 mechanism, becomes operational, in accordance with paragraph 5 of decision2/CMP.17"
We would like to inform you that CDM Prior consideration notifications submission after close of business 30 June 2023 are no longer acceptable.
Displaying
12321-12340
of
13375
notifications.
Project Title | Entity Name | Host Party | Date Received |
---|---|---|---|
0.6 MW Suzlon make Model S-52 WTG at Site Survey No. 731 P ,Village Visawada | Amsal Chem Pvt. Ltd.. | India | 18 Jul 2009 |
2.5 MW run of river mini hydro project in Prafi | Kantor Pusat | Indonesia | 17 Jul 2009 |
IA HIAO Small Hudro Power Plant | Fichtner Carbon Management GmbH for LICOGI 12 JSC | Viet Nam | 17 Jul 2009 |
50.4 MW project at Belgaum distrct in the state of Karnataka, India | EN Renewable Energy Pvt. Ltd. | India | 17 Jul 2009 |
Combined Heat and Power Project | Combined Heat & Power Company Limited | Thailand | 17 Jul 2009 |
96 MW NAFRA Hydroelectric Power Project | Sew Nafra Power Corporation Private Limited (SVP of SEW Energy Limited) | India | 17 Jul 2009 |
Saraburi A Cogeneration Project | Saraburi A Cogeneration Company Limited | Thailand | 17 Jul 2009 |
Industrial Cogen Project | Industrial Cogen Company Limited | Thailand | 17 Jul 2009 |
1 MW run of river mini hydro project in Ndungga | Kantor Pusat | Indonesia | 17 Jul 2009 |
1 MW run of river mini hydro project in Santong | Kantor Pusat | Indonesia | 17 Jul 2009 |
0.6 MW Suzlon make (Model S-52) WTG at Site (WTG exact location no.), Village Visawada, Taluka Porbandar District Porbandar (State Gujarat) | Amsal Chem Private Limited | India | 17 Jul 2009 |
Saraburi B Cogeneration Project | Saraburi B Cogeneration Company Limited | Thailand | 17 Jul 2009 |
Electricity generation from bundled wind energy project activity aggregated by Resurge Energy Private Limited – VII | M/s Param Exports | India | 17 Jul 2009 |
6.25 MW (1.25 MW X 5 Nos.) bundled wind power project in Maharashtra | M/s. Hotel Golden Emerald | India | 16 Jul 2009 |
Arbolito de la Costa Wind Farm | SoWiTec trading GmbH | Uruguay | 16 Jul 2009 |
Castillos Norte Wind Farm | SoWiTec trading GmbHSoWiTec trading GmbH | Uruguay | 16 Jul 2009 |
0.6 MW wind power project.by Gujarat Gems Pvt. Ltd. | Gujarat Gems Pvt. Ltd. | India | 16 Jul 2009 |
“Cooperativa Rural de Electrificación (CRE)” Power Electrical Renewable Generation “Yane-1” | CRE Ltda. | Bolivia | 16 Jul 2009 |
7 MW bundeld Hydro Power Project in Chamba District of Himachal Pradesh | Raajratna Energy Holdings Private Limited | India | 16 Jul 2009 |
12 MW Biomass based Power Project at Sanchore (Rajasthan) | Transtech Green Power Private Limited, TGPPL | India | 16 Jul 2009 |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: