Project 2839 : Chongqing Pengshui Sanjiangkou Hydropower Station
Project title Chongqing Pengshui Sanjiangkou Hydropower Station
- project design document (1456 KB)

PDD appendices
Appendix 1 - Enclosure (344 KB)
Appendix 2 - Enclosure 1 (283 KB)
Appendix 3 - Enclosure 2 (285 KB)
Appendix 4 - Enclosure 3 (746 KB)


- registration request form (14 KB)
SDC description report Not Available. Please refer to our Further Information on SD-Tool
Host Parties China , involved indirectly approval (339 KB) authorization (339 KB)
Authorized Participants: Chongqing pengshui Sanjiangkou Hydropower Co., Ltd.
Other Parties Involved Netherlands , involved indirectly approval (216 KB) authorization (216 KB)
Authorized Participants: Enel Trade S.p.A. (withdrawn)
Sectoral scopes 1 : Energy industries (renewable - / non-renewable sources)
Activity Scale LARGE
Methodologies Used ACM0002 ver. 7 - Consolidated methodology for grid-connected electricity generation from renewable sources
Standardized baselines used N/A
Amount of Reductions 103,137 metric tonnes CO2 equivalent per annum
Fee level USD 19127.4
Validation Report Validation report (1795 KB) Public availability information
Link to information uploaded for public availability
Modalities of Communication
MoC Annex 1
Modalities of Communication valid as of 31/03/2016
MoC Annex 2 (Change/update authorized signatory, name or contact details) valid as of 02/03/2016
MoC Annex 2 (Withdraw Project Participant) valid as of 02/03/2016
Registration Date 13 Apr 10   (view history)  
Crediting Period 13 Apr 10 - 12 Apr 17 (Renewable - Expired)
Renewal no longer possible
Requests for Issuance
and related documentation